Showing posts with label construction. Show all posts
Showing posts with label construction. Show all posts

Wednesday, August 14, 2024

here we go

'Deduccion loable,' from Les douze dames de rhétorique, 1463. 
Cambridge University Library MS. Nn.3.2, fo.36 verso.

Sunday, February 19, 2023

more light

In Autumn 2021, I was once again pondering buying a small greenhouse - KB, are you here? You gave me some very helpful guidance based on your two greenhouses, thank you again. The greenhouse decision rolls around every Autumn. But in 2021, after many weeks of research and pencil-chewing, I came up with sufficient justification and a budget for a kit. For about 24 hours I was SO excited about finally deciding to invest in a greenhouse - a dream for over 30 years!

Then I took a hard look at my current ability to assemble a greenhouse. This put a stop to my gallop. I started wondering who I could hire to do it for me, and what it could cost. It's not a simple task. And it takes multiple people. Site preparation possibly requiring a digger? Oh my. Then, the (all too familiar) question came up: where on my forested property would a greenhouse have enough light?

Overnight it occurred to me to build the goats an extension on the barn instead. (I know. You might not want to go shopping with me.)

West side, framing underway.

I sketched up the design but it was built by Actual Professionals, which is why things look so neat and level and square. The whole construction process was remarkably quick. Usually I don't enjoy standing idly by watching other people work, but this time I just stayed out of the way and took a few snaps every day.

My idea was, that with another 20x8' shelter that can be divided - in minutes! - into two, three, or four little open stalls, more goats could happily share the barn area without intimidation or fisticuffs. I'm pretty pleased with the design. It's a pleasant, flexible, run-in shed. I call it the Peace Pavilion.


the southwest corner

It's been about as successful as all my previous peacekeeping missions in Goat World: i.e., improvement, not perfection. But it's also a very bright and airy place for hoof trimming and cashmere combing! Here, Fern prepares to demonstrate in April 2022:


And although it's not a greenhouse - remember the greenhouse? - the roof is clear corrugated panels, so there is plenty of light, at least until leaf-out. There are also big corrugated windows on the east and west walls, and the south side is completely open. So I told the goats right from the get-go that the southwest "stall" might be seasonally commandeered for use as a seed-starting area. Last Spring I was too busy with extended cashmere harvesting to close off that corner for starting seeds, but this year it could happen.

Fern says, "Really? You're expecting
an easier cashmere harvest this year?"

Hmmm. You have a point, Fernie. Well, we'll see.


By the way, one last comment about light.

Here's what I did with the floss from the milkweed seeds:


And here's why:

magic lantern!
~~~~~




Saturday, August 4, 2018

loose ends



Remember the third part of the big construction project that began in October 2017?

It's finally being finished.



"I'll believe it when I see it."

~~~~~

Thursday, February 1, 2018

turning the january page


It's been a bit of a rollercoaster, has January. Ups and downs, with a lot of snow, torrential rains and flooding, extremely cold weather, and occasional bright days when I have gratefully taken hundreds of photographs.

My workaday world has been one of entirely treacherous footing, which changes nothing about the daily chores except that they take longer. It's a relief when there is snow to walk on instead of ice! I think Moxie agrees, as it makes her commute to the barn much more pleasant:


Piper has been spending a lot of time in recent weeks sensibly snoozing on her couch. She usually accompanies me on the short penguin-walk to the letterbox, but must wait for reasonably safe conditions before we go walking in the woods. We've made the most of it whenever possible!







The biggest January news in Goat World - apart from the ongoing hoof-trimming which always results in heating pads and icepacks for the trimmer - is that the handsome buck returned for a brief visit on Sunday. Now both Vinca AND Azalea may become mamagoats in June! I haven't gotten a good picture of either one this month, so here instead to represent the entire Cloud Harvest Cashmere herd is a January portrait of LeShodu, my Matriarch doe who turned 13 last May:

"And STILL the Boss!"

What I've really wanted to write about all through January - and in December, actually - is the wrapping up of the final "mystery" phase of the 3-part construction project. But I haven't, because it isn't. Wrapped up. In fact, there has been a series of absurd delays - not caused by me or by the carpenter, I hasten to say - beginning in November. November! And I don't want to say anything more about it, partly because it might give away the "mystery" and partly because my head might explode. So...

...moving on to a very different project, my Daily Markmaking effort of 2018 has progressed nicely. I've drawn or painted a little sketch every night in January. Here are a couple you haven't seen:




Something I really enjoy about watercolor is the way it looks close up. For example, here is a "detail" view of the above:

(I just enjoy this.)
~~~

It snowed again last night, so February is starting off as February often does.


And on we go!

~~~~~

Thursday, December 28, 2017

up in smoke

Several small projects were part of the Construction Extravaganza right from the start, and others developed as part of the process. Here is one of the first category: the chimney.

This chimney was added to the house in 1939, if I remember correctly. (The date was recorded in concrete at the base of the chimney in the cellar. It's 8F right now. I'm not going into the cellar to check.)

13 Oct 2017: southeast corner

When I bought the house, the chimney was venting both a propane space heater in the parlor and a massive old propane kitchen range of which I think two burners were functional. I might have tried to have that range repaired, but the amount of space it occupied it this tiny house was hard to justify. Instead I decided to remove it and do without a stove until I could design a little kitchen and put in a wall oven. Looking back, if I had known that I'd be cooking in a toaster oven for a couple of decades before I could make the kitchen happen, I might have made a different decision! But it all worked out.

18 Oct: northwest corner.
Flashing and loose bricks removed.

When I was working in one of my first forest-related jobs, I bought my little woodstove: a Waterford, from Ireland. Friends from work helped move it into my parlor, and that was a learning experience for me: I learned that there are some tasks one should not allow friends to tackle, period. It was a good lesson.


19 Oct: chimney tile extended; spark arrestor standing by.

I almost changed my mind before buying the Waterford, because I was told I would have to put a liner in the chimney. But when I clambered up on the roof, I found that the chimney was lined with tile but for some reason the top tile was lower than the crown. So I put "add one tile to chimney" on my List. That was in the early 90s.


You've got to love a carpenter who has built chimneys.

Apart from cleaning the chimney every year that I burned wood, I did no other maintenance. The last few times I was perched on the roof performing acrobatic stunts with the comically wobbly chimney brush, I noticed mortar beginning to crack between a couple of bricks on the top row. So of course I added "clean and remortar loose bricks" to my List.


19 Oct: most of the work done

And last year I bought a nearly-new spark arrestor cap for $20 at a tag sale held by the local Animal Control facility. A very useful improvement, but it wasn't even ON my List, darn it!


26 Oct: work stopped by days of torrential rain.

When I knew I would have to reroof the house, the chimney tasks - tile, mortar, cap - were naturally included in that project. The repair and improvement was done before the metal roofing went on, and then the carpenter constructed a custom flashing for it, using the roofing material.

27 Oct: a wonder that rain left any leaves on the trees!

The chimney had a long rest in November, waiting for me to dismantle and clean the stovepipe in the parlor - always a dirty, back-aching, mess-making chore. This year I also had two helpers who would have been happy to track soot all through the house on their eight little feet. And I did it on my birthday - don't tell me I don't know how to have a good time! Or age gracefully!

Early the next morning I lit the fire.
Here is the first smoke rising through the "new" chimney:  


There hasn't been snow on that chimney since.
And there probably won't be til Spring.


Since I didn't burn wood last Winter (in the interest of keeping those eight little feet safe), I have a wonderful stockpile of seasoned stovewood this year. Some from my own property, a bit left over from the 2015 delivery, and this gorgeous truckload delivered last December by my Best Forester Friend:

Flashback: 2 December 2016
 I wish you could hear the sound of the wood tumbling!
It's like the happiest thunder in the world.

I always try to stay a full year ahead with stovewood, but don't always manage it. As this Winter approached, I felt quite comfortable if not actually smug. I'm expecting to burn a LOT of wood this year.
And I have a lot of wood to burn.

I'm rich! Rich, I tell you!

As cold as it's been already this year - minus 4F this morning and up to a rollicking 8F at noon - the stove has been kept well fed. I wonder how much of my massive stockpile will be left when Spring rolls around?


~~~~~

Wednesday, November 8, 2017

in partes tres

The builders are away on another job this week, and I am using the time - and the quiet - to tackle other things and generally recharge. So this seems a good time for a little Construction Project 2017 report.

The whole project is actually divided - like Caesar's Gaul* - into three parts. Thinking of it this way helps me to keep the Overwhelm at bay. After all, Caesar supposedly dictated his commentary while riding his horse and conquering Gaul...I'm just trying to keep a roof over my head. Easy-peasy, right?
Even if the project is big enough to have Three Parts.

(There are also a few "small jobs" associated with the larger three, but progress on those separate items just feels like a big bonus.)


PART I


Part One - and the impetus for all the rest - is a necessity: repairing the roof. At a minimum, this meant removing two existing layers of shingles and the heavy tarpaper beneath, and putting down a new layer of wimpy modern tarpaper and a new layer of shingles. Instead, I went the extra mile and chose metal roofing instead of new shingles. Greater material costs and more skill required to do the job properly, weighed against anticipated longer roof-life and less (some say zero) concern about moss growth or ice-damming.


After the old roofing was removed, a layer of weatherproof plywood (the green you can see in the picture below) was added to create an even surface. Can you see the carefully fitted patchwork of boards in the original roof? This is my kind of building method, based on probable necessity and certain thrift. Most of my little house was built, from the studs to the roof, with previously-used lumber. Perhaps it was salvaged from the original farmhouse; I've always thought so.


The original roof boards were almost all in excellent shape; little replacement was needed. The light spot in the center of the image above is a new patch, where a large branch from a white pine had come straight down like a spear during a huge ice storm in...2008? 2010? Hang on, I'll find a snap.

Right through a one-inch-thick board.
That was quite a night.
The hole had been "temporarily" patched with metal the day after the storm, but it didn't leak so it stayed that way. I knew I'd be redoing the whole roof sooner or later.

Well, eventually.

Part I, current status: the house is 100% reroofed.

~~~

Now here comes an example of a "small job" related to the roof: the relocation of the Poultry Palace, built onto the southeast corner of the house a couple of decades ago by professional carpenters. I had hoped to be remove it either intact or in wall sections, and add it to one of the goat barns. The chickens spend most of their time in the goat barn anyway, and it would be a little easier for chores.

By the way, if you want to see how small your house really is,
put a couple of humans on the roof.

This was one of those "no problem" jobs that turned into a rather large-scale undertaking with four people and a tractor all working hard.
Mostly the tractor and operator. 



It turned out differently than expected, but the result is good. Or will be when it's done. Because now that is another "small" job. I'll try to get to it soon, but it's not a priority compared to the Big Three.
~~~



PART II


Part Two of the construction project is an extension of the roofing. Literally. I asked the builder to extend the roof so it continues 12 feet past the east end of the house, supported on a post at each outer corner. No walls, no floor. (I think this may be called a "portico," but if you have another word for it, please share.) Here, a Winter's-worth of firewood can be stored conveniently close to the back door. Piper, Moxie, Della, and I will have an option for getting fresh air at any time, night or day, without getting soaked in rain or swimming through deep snow.


Part II, current status: structural ~80%, roof 100%.

Piper loves it already!

This Winter, I may put up a clothesline.
If I can find one to reclaim, there may be a porch swing.
There may be a potting bench and...
an outdoor sink with freezeproof taps.

Which brings us to Part Three...and the end of this progress report.

Part III will begin when the carpenter returns next week.

And oh my gosh.
Part III is going to be a doozy.
~~~~~


*Gallia est omnis divisa in partes tres, quarum unam incolunt Belgae, aliam Aquitani, tertiam qui ipsorum lingua Celtae, nostra Galli appellantur.
"All Gaul is divided into three parts, one of which the Belgae inhabit, the Aquitani another, those who in their own language are called Celts, in ours Gauls, the third." 
- Julius Caesar, Commentarii de Bello Gallico (Commentaries on the Gallic War)

Sunday, January 31, 2016

washing the rice


Edward Espe Brown, perhaps best known as the author of the Tassajara Bread Book, once asked his Zen teacher for advice on how to approach his new role as head cook. Roshi said something like:

"When you're washing the rice, wash the rice; when you're cutting the carrots, cut the carrots; when you're stirring the soup, stir the soup."

I heard Brown relate this story in a film some years ago, and I've drawn upon it countless times since. In recent weeks, I've brought it to mind daily. Many times daily. Usually aloud.

"When I'm carrying the water bucket...when I'm shifting this hay bale...when I'm folding this laundry...when I'm filling the woodbox..."

There hasn't been much actual washing of rice. There has been stirring of soup. And there has been a lot of frozen food and toast and - Decadence Alert! - grapefruit purchased already segmented.

"When I'm walking with Piper..."




"When I'm sawing this board...





"When I'm breathing through this pain and trying to sleep..."




I have accomplished very little that wasn't strictly necessary in January, but the stuff that was truly necessary has been done. And that's got to be enough.
It is enough.
~~~

I want to say a heartfelt "thank you" to everyone who left a comment on my most recent post, or who sent me an email, or a message on ravelry. Every word meant a lot to me. My silence since has not meant a lack of appreciation. I hope you know that. I believe you know that. Thank you.
~~~

Today's post feels somewhat scattered, but I'm going to go ahead and put it up. My recent communication attempts have been rusty and clunky, and challenged by even the 140-character limit of twitter. This post is probably the closest I've come to coherence in a while.

Wait...can coherence be scattered?
~~~

See what I mean? 
~~~~~

Saturday, December 13, 2014

porch, day three

Yesterday, when the carpenters and electrician had gone -
oh, did I mention the electrician?
It seemed sensible to add outlets while walls are open - 
I spent a good half hour just tidying up.
At one point, I was sweeping snow into a dustpan.
It was surreal.
But a lot of snow had been tracked in and packed down.
It had not melted on the cold porch,
but it would have made pools when the sun came out again.


Friday morning, before chores,
I stepped out to admire the overall progress.
The ceiling insulation was all in place, and most of the ceiling boards.
The kneewalls were wired, ready for insulating.


I looked at the time...

the carpenters weren't due for at least an hour.

The goats weren't calling for Room Service.

So, what the heck.


I started insulating the kneewalls.
When the carpenters arrived, I had only one little space left to fill,
but I quickly got out of the way and let them get to work.
It was good timing; my back was protesting all the leaning.
But gosh, it felt good to do a tiny bit of the work!


Today the remainder of the ceiling was covered,
and careful work began on the interior walls.
(You can left-click to embiggen these snaps, if interested.)
That's all native white pine, locally harvested and milled.
Hand-selected and driven home on the roof of that tireless workhorse,
the Little Green Sportswagon.


How I love wood.


It was a pretty good day!

Now the carpenters will be off til Tuesday,
which gives me time to resolve the gable question.
It's a pesky problem.
Feel free to weigh in with a comment -
I'd love to hear your opinions!

Backstory:

All along, even when the first builder was here,
finding an option for the gable was a major priority.
I do not want to close it in.
But every effort to find windows, old or new,
to fill even a part of the space - 
like a rectangle or square in the center,
or a transom across the bottom -
has been futile.
So far.

As you can see in the image below,
the tip of the peak has already been cut off by the new ceiling,
and it looks very different, but still okay.
And simply closing in the whole thing would look nice -
more wood!
What could be better?

Well, glass. Glass would be better.
Because I would really miss that view into the canopy.
REALLY.


Even from inside the adjacent parlor,
looking south into the porch and seeing that bit of sky and trees
makes a big difference in how the room feels.
And on the porch, the difference is huge.
It's like the difference between a nice room
and a nice space, I suppose.

A custom-built window to fit the entire gable is not a great option.
Even if I could justify the expense,
it would take weeks to have a window made.

The carpenter suggested a functional compromise:
closing in the peak with pine "for now"
so he can finish the interior construction,
but leaving the outside of the gable tar-papered for protection
until I find a permanent window to install.
Someday.
Maybe next Spring.
I told the carpenter that, rather than closing it in,
I would probably be happier with clear plastic 
stapled across the gable opening until I find a window.
He looked as if I had slapped him.
That's probably how I looked when he suggested closing it in.
I think we will all be keeping our eyes open this weekend,
looking for window options.
~~~

Other, easier weekend tasks:
making a decision on windowsill depth (fun!)
and a couple of trips to pick up more insulation,
to be installed between the floor joists.
This is going to be one cozy room.

Little by little!


Wishing you a delightful weekend!
~~~~~